Monday, February 04, 2008

Au revoir Nena

Well the day has come,

Nena has gone to the paintshop, and will be away for around 3 weeks.

It was a significant landmark sending her off, and I just hope I have remembered to cut and drill all the holes I needed ! I am not looking forward to having to drill my lovely new paint. Here is Nena being sent off:










Pleasingly her component parts were gathered up and shipped off in another Volkswagen:

I have decided on my colour (will be revealed soon), to be accented with satin black parts - louvres, dash, window tunnel, underside of canopy and bonnet.


Wing mirrors and reversing sensors will be colour coded body colour.


Once she arrives back I will be laying out lots of sheets, bubble wrap etc and assembling with care !


Now the Detling Kit Car show in April looks like a strong possibility !


More soon, from an empty garage !!


Jim






Sunday, January 27, 2008

The moment I have been waiting for

It has to be said that the NOVA's crowning glory is it's roof. And if I am honest it was the sight of a white NOVA with it's roof up at the top of the road when I was around 17 that got me interested. Back then I hadn't realised the VW beetle link, despite being a keen V dubber.

Well at last all the pieces of the jigsaw have been joined up. New stainless steel hinges (cheers Mike and Elaine), new pump and rams (cheers Paul at Club Nova), new wiring loom (thanks Paul again), and a remote kit.

Now I am no plumber, so there was an initial leak when I set it up, as I made one connection wrongly! Also when I dry fitted it all I realised the pin on the hinges was too high, meaning the roof wouldn't open far enough ! But after a quick bit of welding (thanks Martin at Mataan), a visit to Pirtek for some fittings, and Harry's expertise in bleeding the system, and remote gizmos I was there.

Still some fine tuning and adjustment to go, but it shows it all works !

Now I take it all apart and store it safely whilst Nena goes to the paintshop. this was the last big job to do pre-paint, I just need to mount the seats now and I beleive I am ready to hand Nena over - scarey !

For now, enjoy the moment with me:

More soon, and hopefully pictures of an empty garage as Nena goes for paint !

All the best,

Jim

Saturday, January 26, 2008

The long and windy road

I should have posted this a while ago, as you can see it is at the old house, but sums up how kit car building can make you feel at times !

It was the first drive (with lots of clutch slip) in Nena !

It will get better !


Wednesday, January 23, 2008

Why the 3 month gap ?

Moving house, Xmas, decorating.

That ok with you !



Anyhow, back to it all now, and set myself another deadline ! Paintshop by 3rd February, so as I write this I have 7 free evenings and two weekends to do all the snagging jobs before the paint goes on !



Scary !



Still on a positive note I have a new garage for Nena, which is much bigger than the last:

The downside is that it can easily become a dumping ground !
















More soon, and hopefully you will find out if I make the painting deadline !

All the best,

Jim

Sunday, October 21, 2007

A Sunday drive

Well progress is fast now ! After the success of the wiring, and engine test last weekend I am getting more confident.

Sarah went through a lesson in bleeding brakes (and hydraulic clutch), and here are the results. This is the first tentative drive out of the garage:



and after that, and some small adjustments (including fuel !) it was onto the open road. As you can hear there is some clutch slip going on. Initially I put this down to the clutch (still the original from the donor), but further investigation revealed some adjustment of the slave cylinder is required. Brakes also need some more bleeding, but it is getting there:




Hopefully more updates soon - the next week is going to be spent fine tuning the clutch, and re bleeding brakes. Next weekend I hope to get it over 20mph !

One British motoring victory this weekend then !